Project

General

Profile

Stabilisation process » History » Version 6

Greg Burri, 11/06/2009 03:34 PM

1 1 Greg Burri
h1. Stabilisation process
2
3
These process involves during the alpha and beta phases. It consists to try to find and resolved a maximum of bug.
4
5 2 Greg Burri
# Take a look in the bug list, if there is some of them tagged as _Urgent_ or _Critical_ and you are able to resolve it (you know the component involved) then try to fix them.
6 5 Greg Burri
## Before resolving it, write a unit test into the component test pool if possible to reproduce the bug. The goal is to prevent future regression.
7 6 Greg Burri
## When you commit some patch, don't forget to add the reference to the ticket into the commit message like #42.
8 1 Greg Burri
# If there is no bug to resolve, play freely with the software, do anything you want, try to use it in the most unconventional way.
9
# If you detect an anomaly :
10
## Try to locate the component and the chunks of code involved
11
## If it's a critical bug and you know the component try to resolve it immediately
12
## Else insert it as a new issue in the bug tracker. Write a maximum of functional and technical details. It's very important to write the way to reproduce it.